It is a study to evaluate and identify the predictable environmental consequences and the best combination of economic and environmental costs and benefits of the proposed project. On the basis of EIA, an Environmental Management Plan (EMP) is prepared, which is a description of the means by which the environmental consequences as pointed out in the EIA will be mitigated. Together the whole draft is termed as EIA-EMP report.
Why EIA is conducted:
- To systematically examine both beneficial and adverse consequences of the proposal.
- To ensure that those consequences are taken into account during project design.
- To identify possible environmental effects of the proposal and means to mitigate them.
- To predict whether there will be significant adverse effects even after the mitigation.
- To lessen conflicts by promoting community participation and informing decision makers.
Final Destination for Punjab PSC Notes and Tests, Exclusive coverage of PPSC Prelims and Mains Syllabus, Dedicated Staff and guidence for Punjab PSC PPSC Notes brings Prelims and Mains programs for PPSC Prelims and PPSC Mains Exam preparation. Various Programs initiated by PPSC Notes are as follows:-
- PPSC Mains Tests and Notes Program
- PPSC Prelims Exam 2024- Test Series and Notes Program
- PPSC Prelims and Mains Tests Series and Notes Program
- PPSC Detailed Complete Prelims Notes